To begin with, the Jai Hind metro station was prepared to become elevated. Nevertheless, the AAI objected the elevated stretch up on the airport could possibly pose a menace to plane, And so the route was further reworked and also the station was shifted underground, 150 m from your Airport https://trentonpdwjv.blogdeazar.com/32228961/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf