As observed from your figure under, continuous auger is used to drill the borehole, lift up drilled soil, and pour concrete whilst the auger is moved up. Therefore, the borehole would not require casing or hydrostatic pressure to prevent damage to the borehole wall. The development system includes drilling the https://remingtonuvvpi.p2blogs.com/31643513/the-cast-in-situ-piles-in-bangladesh-diaries