The 10,000m RC drilling programme will prioritise the Central Target area. This zone contains shallow, thick mineralisation within the upper 70 metres of the deposit. Pacgold has never drilled this specific area before. https://colitco.com/pacgold-resumes-drilling-alice-river-project/